The Villas derives its name from the ancient Thai word Amarit, meaning “the water of life.
” Located near one of Phuket’s most picturesque beaches and surrounded by a lush national park, this project offers an exclusive sanctuary where nature and luxury harmonize. Inspired by the serene landscapes, our design integrates verdant greenery into every villa, creating spaces that truly come alive.
Each villa is crafted with panoramic garden views in mind. The central living spaces offer open, unobstructed vistas of tropical gardens, allowing guests to feel immersed in nature right from the living room, rather than enclosed by solid walls.
Location: Nai Yang Beach & National Park
Description:
Situated just minutes from Nai Yang Beach and within reach of Phuket’s most beautiful national park, Amrits Luxury Villas offers a gateway to the Andaman’s natural beauty. With expansive scenery and rich wildlife, residents can enjoy sunset walks with family, explore the local fish market, introduce children to nature’s wonders, or visit some of Thailand’s most scenic golf courses.
Villa Highlights:
Three spacious bedrooms per villa, with central living and dining areas seamlessly connecting to the terrace, pool, and all bedrooms.
An expansive, open layout with ample natural lighting and 360° views of an in-home tropical garden, fostering a peaceful and luxurious environment.
The first phase includes 12 villas, each with 3 bedrooms and 3 bathrooms.
Land plots range from 310 to 445 sqm, with built-up areas of approximately 270 sqm. The full project will feature three phases and a total of 33 villas.
Total project plot size: 11.5 Rai (18,429 sqm).
Pricing:
Starting at THB 21,000,000 (approx. USD 548,000) for a 3-Bedroom Pool Villa
Furniture package available separately, starting at THB 1,800,000.
Property Summary:
3 Bedrooms, 3 Bathrooms
Plot Size: 311 – 315 sqm
Built-Up Area: 270 sqm
Private Swimming Pool: 25.9 sqm
Parking Area: 33 sqm
Onsite Amenities:
Clubhouse
Sauna
Gym
24/7 Security
Ownership Options:
Leasehold or Freehold
Construction Start: March 2024
Estimated Completion: December 2026
Compare listings
Compare